| ENGINEERING RECENT PROJECTS: | (Jump back to INTRODUCTION) |
| Murray Drive, City of Farmington The City of Farmington contracted with Cheney-Walters-Echols, Inc. to design improvements to L.E. Murray and the "Old Bloomfield Highway." These two projects involved extensive relocations, major drainage structures and right-of-way acquisition. The total
cost was approximately $8,000,000Cheney-Walters-Echols, Inc. received a "National Quality Initiative" award from the Federal Highway Administration for this project. Browning Parkway, City of Farmington The City of Farmington contracted with Cheney-Walters-Echols, Inc. to select right-of-way for a connection between East Main Street and U.S. Highway 64. ![]() Two alternate routes for the project were reviewed and the city selected the current route that has been obtained, designed and constructed. During the archeological study, a Chaco Road was discovered. The site had to be mitigated proior to construction. Jicarilla Apache Tribe Water Treatment Facility, Dulce, New Mexico This $1,500,00 gallon per day capacity plant was designed and constructed for the Jicarilla Apache Tribe. It replaced an older 1,000,000 gallon per day plant that was difficult to operate and maintain. ![]() | |